DAE P254-200D KIT, UL listed kWh Demand Submeter, 3 phase, 4 wire (3 hot wires 1 neutral), 200A, 120/208v, 3 Split Cores CTs, RS485

DAE P254-200D KIT, UL listed kWh Demand Submeter, 3 phase, 4 wire (3 hot wires 1 neutral), 200A, 120/208v, 3 Split Cores CTs, RS485

$719.38
Skip to product information
DAE P254-200D KIT, UL listed kWh Demand Submeter, 3 phase, 4 wire (3 hot wires 1 neutral), 200A, 120/208v, 3 Split Cores CTs, RS485

DAE P254-200D KIT, UL listed kWh Demand Submeter, 3 phase, 4 wire (3 hot wires 1 neutral), 200A, 120/208v, 3 Split Cores CTs, RS485

$719.38
Shipping calculated at checkout.

About This

  • UL/cUL Listed, Conform to ANSI C12.1 national accuracy standards. Comes with a lower cover which has two 3/4" knockouts to connect the conduits. One in-inline fuse with holder is attached for you to connect hot wire A to VA of the meter. The meter is powered by VA and VB. VC just takes reference of voltage from hot wire C and does not need fuse. Please connect the wiring as per 5th picture.
  • DAE Cloud Metering (2nd picture) available with DAE CC2030 Gateway. CC2030 will collect energy data from DAE electrical meters and send them to Cloud Server through Ethernet. With PC, cell phone or tablet, landlords or property managers can get access to real time data, monthly kWh and billing reports to their tenants. TOU (Time of Use) billing reports are also available. No IT guy required. Just connect wires as per a simple picture (see video) & ready to go.
  • For existing building, hard to draw cable between electric meter (close to electric panel) and CC2030 (close to your router), please choose 1 CC2030 KIT + 2 WSC500A RF Converters to connect electric meter and CC2030 wirelessly (3rd picture). Indoor use only, DAE B1725 watertight enclosure is available for outdoor use (4th picture).
  • Factory Calibration Certificates available. DAE Controls LLC is an Minority Business. Please feel free to get the NMSDC Minority Supplier Certificate from DAE Controls Website. Following CTs are available with the meter. Split Core CTs DAE CT-5000SB (5000A), CT-3000SB (3000A), CT-2000SB (2000A), CT-1500SB (1500A), CT-1000SB (1000A), CT-600S (600A), CT-400S (400A), CT-200SB (200A), CT-100S (100A) and Solid Core CT-600D9 (600A), CT-400D6 (400A), CT-200D3 (200A).
  • For monitoring up to 8 electric panels remotely with cell phone, PC and generate billing reports, you will just need 1 SMB350-UL-8-B KIT + 1 CC2030 KIT.

Made with care

Great value

Elegant design

Quality materials

Details

This product is crafted with quality materials to ensure durability and performance. Designed with your convenience in mind, it seamlessly fits into your everyday life.

Shipping & Returns

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.

We are committed to ensuring a positive shopping experience for all our customers. If for any reason you wish to return an item, we invite you to reach out to our team for assistance, and we will evaluate every return request with care and consideration.

Play video

Shop The Full Collection